WORKS MADE

WORK CARRIED OUT BY THE COMPANY

 

General tour of the different works executed, with the highest standards of quality and safety, thanks to the experience developed over 30 working years. Implementing different knowledge and techniques on the works carried out, as well as their respective engineering, procurement and construction services (CPI).

DISTRIBUTION AND TRANSMISSION LINES

PROJECT CUSTOMER STATUS
  • (PROJECT PITSA ELECENTRO) BLOCK CONSTRUCTION III DISTRIBUTION LINES AT 13.8 KV IN UNARE MUNICIPALITIES - ZARAZA, BARRIALITO - GUARICO STATE (203 KM)
BUILDINGS 2090, C.A 100% EXECUTED
  • PROJECT PITSA ELECENTRO CONSTRUCTION OF DISTRIBUTION LINES GROUP I TO 34.5 KV IN THE MUNICIPALITIES PTA POLA - TORO PINTADO - LA CEIDA - LA BLANQUITA - LAS PIEDRITAS, STATE APURE (130 KM)
OPROTEC , C.A 100% EXECUTED

PROJECT CUSTOMER STATUS
  • 115 KV TRANSMISSION LINE. S/E CABIMAS III S/E TABLAZO II.
C.A.D.A.F.E 100% EXECUTED
  • 115 KV TRANSMISSION LINE. S/E ISIDRO S/E PUNTO FIJO
C.A.D.A.F.E 100% EXECUTED
  • 115 KV TRANSMISSION LINE. S/E SAN GERONIMO S/E ZARAZA
C.A.D.A.F.E 100% EXECUTED
  • LINE AT 115 KV. S/E ALFREDO SALAZAR S/E REBOMBEO II
C.A.D.A.F.E 100% EXECUTED
  • LINE AT 115 KV. S/E MACARAO S/E SAN JACINTO
C.A.D.A.F.E 100% EXECUTED
  • 115 KV LINE S/E LA RAIZA S/E SANTA LUCIA
C.A.D.A.F.E 100% EXECUTED
  • 115 KV LINE CONSTRUCTION. S/E VALENCIA S/E CAMPO CARABOBO S/E ARENOSA
C.A.D.A.F.E 100% EXECUTED

PROJECT CUSTOMER STATUS
  • ENGINEERING PROCUREMENT AND CONSTRUCTION FOR THE DIVERSION OF THE LINE AT CENTRO CARBONERO PLANT CENTRO PALITO I AND II PLANT AT 115 KV
PDVSA EL PALITO 100% EXECUTED
  • LT 115 KV DT DETOUR: S/E MERIDA II S/E VIGIA I TO S/E VIGIA II (LONG 7.3KM). S/E MERIDA II S/E VIGIA I TO S/E MERIDA III (LONG 3.52KM). S/E MACAGUA NEW S/E LA ROMANA TO S/E UPATA (LONG 1.5 KM). S/E VIGIA I TOVAR TO S/E VIGIA II (LONG 7.5 KM)
C.A.D.A.F.E – UNE 100% EXECUTED
  • REHABILITATION AND CHANGE OF CONDUCTOR AT 500 KCMIL ON THE 115 KV LINES FROM THE BARBULA AND GUAPARO SUBSTATIONS TO THE SAN DIEGO SUBSTATION
PDVSA EL PALITO 100% EXECUTED
  • 115 KV LINE DIVERSION S/E VILLA LOLA S/E LA ROMANA (0.5 KM)
C.A.D.A.F.E – UNE 100% EXECUTED
  • REHABILITATION AND CHANGE OF DRIVER AT 500 KM OF THE 115 KV LINES ASSOCIATED WITH THE LA CABRERA THERMOELECTRIC PLANT
PDVSA ELPALITO 100% EXECUTED
  • MACAGUA NEW LA ROMANA LINE 115 KV 55 KM
C.A.D.A.F.E-UNE 100% EXECUTED

PROJECT CUSTOMER STATUS
  • ENGINEERING PROCUREMENT AND CONSTRUCTION FOR THE DIVERSION OF THE LINE AT CENTRO CARBONERO PLANT CENTRO PALITO I AND II PLANT AT 115 KV
PDVSA EL PALITO 100% EXECUTED
  • LT 115 KV DT DETOUR: S/E MERIDA II S/E VIGIA I TO S/E VIGIA II (LONG 7.3KM). S/E MERIDA II S/E VIGIA I TO S/E MERIDA III (LONG 3.52KM). S/E MACAGUA NEW S/E LA ROMANA TO S/E UPATA (LONG 1.5 KM). S/E VIGIA I TOVAR TO S/E VIGIA II (LONG 7.5 KM)
C.A.D.A.F.E – UNE 100% EXECUTED
  • REHABILITATION AND CHANGE OF CONDUCTOR AT 500 KCMIL ON THE 115 KV LINES FROM THE BARBULA AND GUAPARO SUBSTATIONS TO THE SAN DIEGO SUBSTATION
PDVSA EL PALITO 100% EXECUTED
  • 115 KV LINE DIVERSION S/E VILLA LOLA S/E LA ROMANA (0.5 KM)
C.A.D.A.F.E – UNE 100% EXECUTED
  • CIVIL WORKS FOR MAINTENANCE AT LT A 115 KV ISIRO - PUNTO FIJO
CADAFE UNE CUBA 100% EXECUTED
  • DIAGNOSTIC CUTTING OF PICA WEED MAINTENANCE DOUBLE TERN LINES 115 KV S/E BARBULA AND GUAPAZO TO THE S/E SAN DIEGO
PDVSA EL PALITO 100% EXECUTED
  • REHABILITATION AND CHANGE OF DRIVER AT 500 KM OF THE 115 KV LINES ASSOCIATED WITH THE LA CABRERA THERMOELECTRIC PLANT
PDVSA ELPALITO 100% EXECUTED
  • MACAGUA NEW LA ROMANA LINE 115 KV 55 KM
C.A.D.A.F.E-UNE 100% EXECUTED

PROJECT CUSTOMER STATUS
  • Line Transmission Project for the Expansion of the Western Central Power Plant Associated with the Cojedes State.
CHINA CAMC ENGINEERING CO. LTD 100% EXECUTED
  • Supply of Stubs and metal structures (galvanized iron towers) for 400 Kv Transmission Lines. Expansion Project of the Transmission System Associated with the Cojedes State.
CHINA CAMC ENGINEERING CO .LTD 100% SUMINISTRADO
  • Supply of Stubs and metal structures (galvanized iron towers) for 115 Kv Transmission Lines. Expansion Project of the Transmission System Associated with the Cojedes State.
CHINA CAMC ENGINEERING CO. LTD 100% EXECUTED


PROJECT CUSTOMER STATUS
  • 230 KV LINE. BARBECUE S/E SANTA TERESA SECTION II ASSEMBLY AND DISASSEMBLY
C.A.D.A.F.E 100% EXECUTED
  • CONSTRUCTION OF CIVIL WORKS, ASSEMBLY AND COMMISSIONING OF SECTION I OF THE 230 KV ACARIGUA II – BARINAS IV TRANSMISSION LINE, COMPRISED FROM TORE N° 1 TO N° 189
ABB 100% EXECUTED

PROJECT CUSTOMER STATUS
  • CONSTRUCTION OF CIVIL WORKS, ASSEMBLY AND COMMISSIONING OF SECTION I OF THE 230 KV ACARIGUA II – BARINAS IV TRANSMISSION LINE, COMPRISED FROM TORE N° 1 TO N° 189
ASEA BROWN BOVERI 100% EXECUTED


PROJECT CUSTOMER STATUS
  • PARTIAL SUPPLY AND MONT. 400 KV SECTION S/E URIBANTE S/E BUENA VISTA
C.A.D.A.F.E 100% EXECUTED
  • SUBCONTRACT: RETENTION OF THE LINE AT 400 KV, S/E CENTRO PLANT S/E YARACUY
ASEA BROWN BOVERI 100% EXECUTED
  • PARTIAL SUPPLY AND ASSEMBLY OF THE 400 KV LINE DIVERSION S/E BUENA VISTA S/E EL VIGIA
C.A.D.A.F.E 100 % EJECUTADO
  • CIVIL WORKS AND ASSEMBLY OF STRUCTURES ON THE 400 KV LINE S/E EL VIGIA II S/E URIBANTE
C.A.D.A.F.E – UNE CUBA 100% EXECUTED
  • ENGINEERING PROCUREMENT AND CONSTRUCTION FOR THE INTERCONNECTION OF THE 400 KV LINE FROM NEW PLANTA CENTRO POWER PLANT TO THE PLANTA CENTRO SUBSTATION AND THE ARENOSA SUBSTATION
SINOHYDRO EL PALITO 100% EXECUTED

PROJECT CUSTOMER STATUS
  • REHABILITATION AND CORRECTION OF DEFECTS ON THE BUENA VISTA EL VIGIA LINE FOR ITS COMMISSIONING
UNITE CUBA 100 % EJECUTADO
  • REPLACEMENT OF TOWERS NRO 16 AND 17 OF THE 400 KV TRANSMISSION LINE CENTER PLANT – YARACUY AS A PRODUCT OF THE COLLAPSE OF TOWER NRO 17.
CORPOELEC 100% EXECUTED
  • ENGINEERING FOR THE INTERCONNECTION OF THE NEW PLANT CENTER POWER PLANT LINE
SINOHYDRO 100% EXECUTED


PROJECT CUSTOMER STATUS
  • ENGINEERING FOR THE INTERCONNECTION OF THE NEW PLANT CENTER POWER PLANT LINE
SINOHYDRO EL PALITO 100% EXECUTED
  • EL VIGIA POWER TRANSMISSION LINES AND ELECTRICAL SUBSTATIONS PROJECT.
CHINA CAMC 100% EXECUTED

PROJECT CUSTOMER STATUS
  • CITY BOLIVIA SUB-STATION 115/13.8 KV 20MVA
OPROTEC, C.A 100% EXECUTED
  • UNARE SUB-STATION 115/13.8 KV 30-36 MVA
CONSTRUCTIONS 2090 100% EXECUTED


PROJECT CUSTOMER STATUS
  • ENVIRONMENTAL SANITATION AT THE BAJO GRANDE REFINERY
PDVSA ZULIA 100% EXECUTED
  • FACILITIES FOR THE SANITATION OF AREAS AFFECTED BY SLOP OIL SPILLS OF THE BACHAQUERO SOUTH CANAL IN THE BACHAQUERO PDT, BAJO GRANDE, H-7 AND F-6, OF THE STATE OF ZULIA.
PDVSA ZULIA 100% EXECUTED


PROJECT CUSTOMER STATUS
  • ENGINEERING FOR THE INTERCONNECTION OF THE NEW CENTRAL POWER PLANT LINE.
SINOHYDRO CORPORATION LIMITED 100% EXECUTED
  • ENGINEERING FOR THE CONSTRUCTION OF THE LINE DIVERSION OF THE CARBONERO CENTER PLANT TO THE CENTRO PALITO I AND II PLANT AT 115 KV.
PDVSA 100% EXECUTED
  • ENGINEERING FOR THE CONSTRUCTION OF THE INTERCONNECTION OF THE 400 KV LINE FROM NEW PLANTA CENTRO POWER PLANT TO THE PLANTA CENTRO SUBSTATION AND THE ARENOSA SUBSTATION.
SINOHYDRO CORPORATION LIMITED 100% EXECUTED
  • ENGINEERING FOR THE REHABILITATION AND CHANGE OF CONDUCTOR AT 500 KCMIL ON THE 115 KV LINES FROM THE BARBULA AND GUAPARO SUBSTATIONS TO THE SAN DIEGO SUBSTATION.
PDVSA 100% EXECUTED